ABUND
This architectural development is conceived across three merged lots, allowing for a thoughtfully composed project that maximizes space, privacy, and visual presence. Its facade stands out with privileged views toward a private park, creating a sense of openness and connection with nature rarely found in the urban context. Designed as a true oasis, the project balances tranquility and sophistication while remaining firmly rooted in its surroundings.
Located in the vibrant epicenter of the city, just steps from Fifth Avenue and some of the area’s most iconic restaurants, markets, and boutiques, the development offers immediate access to the best of urban living.
Positioned just off 38th Street—one of the avenues with steadily increasing property values—it represents a strategic investment as well as a refined lifestyle choice. The project is scheduled for delivery in mid-2026, marking a new milestone in the evolution of TOHOKU LIVING.
30 units
9 typologies
7 floors
FOLLOW OUR CONSTRUCTION PROGRESS
LAND CLEARING | December 2024
In October 2024, the land for our upcoming project was cleared and prepared for construction. This initial phase involved the removal of vegetation, debris, and surface leveling, ensuring the site was ready for the structural groundwork to begin. Proper site preparation was essential to establish a solid foundation for the smooth progression of the construction process.
Following the land clearing, the excavation phase was carried out to prepare for the foundation work. This process included digging to the required depth and shaping the site according to the structural plans. The excavation marked a crucial milestone, setting the stage for the installation of the reinforced concrete elements that would support the building’s structure.
EXCAVATION | January 2025
FOUNDATION SLAB | Feb/ May 2025
We continue to make progress with the preparation of the foundation slab, placing a sheet of high-density black polyethylene on the ground. This material allows us to create an effective moisture barrier, preventing groundwater from rising and compromising both the concrete and interior finishes. This sheet helps us retain the necessary hydration during the concrete's curing, which improves its final strength and reduces the risk of early cracking. It also prevents the concrete from being contaminated by soil or impurities and protects the steel bars from corrosion.
We placed the steel bars in the diameters required by the structural calculations. They form part of the main reinforcement grid that reinforces the slab, designed to support the building's loads, the weight of the walls and columns, potential ground settlements, and seismic events. This entire process is part of our commitment to a solid, safe, and durable foundation for ABUND and is a key step in the overall progress of the Tohoku Living development.
SNEAK PEEK!
Major milestone on the ABUND project: foundation cementing successfully completed. This marks the end of groundwork and the start of vertical construction.
The first foundation of the ABUND project was completed successfully, marking a key milestone in the early stages of construction. This phase involved pouring reinforced concrete over the previously excavated and prepared ground, establishing a solid base that will support the structure’s vertical elements. The execution of this foundational work reflects our commitment to quality and long-term structural integrity from the very beginning.
FOUNDATION PHASE 1
June / July 2025
POURING OF STRUCTURAL COLUMNS & THE MAIN CISTERN-FOUNDATION
August 2025
We’ve advanced with the pouring of structural columns and the main cistern—key elements for the project’s strength and functionality.
The reinforced concrete columns provide stability and safety, while the cistern ensures an efficient and reliable water supply for the community. Each stage reinforces our vision: a high-quality development designed to experience the Caribbean with comfort and confidence.
POURING OF WALLS AND COLUMNS
August 2025
At this stage, the pouring of structural walls and columns was carried out using high-strength ready-mix concrete. Mechanical vibration procedures were applied to ensure proper compaction and prevent the formation of voids. In addition, special attention was given to the correct alignment and verticality of the elements, ensuring compliance with structural parameters and the required quality for the continuity of the project.
SNEAK PEEK!
Major milestone on the ABUND project: foundation cementing successfully completed. This marks the end of groundwork and the start of vertical construction.
STRUCTURAL PROGRESS, MASONRY & FINISHES ELECTROMECHANICAL INSTALLATIONS & VERTICAL MOBILITY SYSTEMS
Sep - Oct - Nov Quarter 2025
The construction of walls, columns, beams, and slabs was completed to high quality and safety standards, ensuring strong structural integrity for the next above-ground stages. Work also included plastering, wall alignment, and technical finishes in service and circulation areas, preparing optimal conditions for the upcoming phases.
Hydraulic, sanitary, and electrical systems were installed across both basement levels, ensuring efficient and coordinated underground infrastructure. Passenger and vehicle elevators were also installed and are now being integrated into the project’s electromechanical systems.
CONSTRUCTION UPDATE | FEB 2026
We completed the ground floor lobby slab — a key structural milestone.
The building is now officially taking shape. Columns and first-level walls are going up, making progress visible above ground for the first time. Underground parking is nearly complete, internal systems are advancing, and all concrete and pressure tests were certified by external laboratories — ensuring precision and long-term quality. With materials already on site, walls will be up within the next 10 days. ABUND is evolving from structure to space.
Stay connected for what’s next.